The project is scheduled to begin June of 2025.
The project is scheduled to begin June of 2025.
Construction for the sewer extension along Randall Avenue is set to begin early summer. The locations of activities associated with this project are shown on the attached map and the work to be completed consists of installing sanitary sewer and then repaving Randall Avenue. The project is scheduled to take place from summer to fall of 2025, with the final lift of pavement and cleanup into the fall of 2025.
There are no utility disruptions anticipated with this project.
The following is a summary of the preliminary project schedule:
During construction, there will be some additional heavy truck and equipment traffic coming through town. It will be necessary to close streets partially or completely to vehicular traffic for your safety. Street parking may also be restricted at some times and in certain areas.
The Township, Contractors, and Bollig Engineering ask that everyone stay clear of construction zones, obey construction signs, and be safe and cautious around construction equipment. If you have questions or concerns about the project, please contact Will O’Halloran, on-site Resident Project Representative (RPR) or Nathan Feist, Project Engineer at 218.595.7940.
Will O’Halloran
Resident Project Representative
Bollig Engineering
wohalloran@bollig-engineering.com
218-595-7940
Nathan Feist
Project Engineer
Bollig Engineering
nfeist@bollig-engineering.com
218-595-7940
Veit Construction
veitusa.com
218-626-2242
Let’s talk about your community’s needs and how Bollig Engineering can help you build a safe and sustainable future for your residents.
Get In Touch
Ready to learn more? Let’s work together to make great things possible.