City of Sacred Heart

Like many rural communities, the age and condition of Sacred Heart’s utility systems were causing significant problems. The majority of Sacred Heart’s utility system, including a deteriorated sewer system, was more than 80 years old and failing.  A major overhaul of the City’s drinking water, wastewater, and storm water systems was needed to stop emergency utility repairs, MPCA violations, structural deficiencies, street flooding, and so much more.

Long-Term Planning for Sacred Heart

When Bollig staff began planning efforts with Sacred Heart leaders in 2011, it became apparent that nearly all underground utility infrastructure required replacement. Clay sewers and cast iron watermains had passed their useful lifespans and were causing numerous issues. City streets had deteriorated and flooded with each rainfall. The City needed a comprehensive planning effort to address each issue as well as assistance with securing the funding needed to address all their infrastructure issues.

Phase 1

Once the Sacred Heart’s initial needs were identified, it was clear that a multi-phased project approach would be the best option. Bollig and the City worked together to develop a plan to divide the work into manageable projects, with three initial construction contracts to address their most immediate needs. In 2014, Phase 1 funding was secured for the following projects.

Key Projects:

  • Infrastructure Improvements Project
    • Prioritized portion of water, sewer, and storm utilities replacement
    • 29 blocks of Street Reconstruction
  • Wastewater Treatment Plant Improvements Project
    • Replaced the failing trickling filter with new trickling filter
    • Added chemical phosphorus treatment and dechlorination
    • Replaced influent lift station
  • Water Meter Replacement Project
    • Replaced all meters with remote read technology
    • Added valves on plumbing for City maintenance

Phase 2

With much work completed in Phase 1, the City of Sacred Heart sought to complete the project they had embarked on. In 2017, funding for Phase 2 was secured. This phase began construction where the previous project left off. While constructing in Phase 1, it was discovered that the Imhoff Tank at the Wastewater Treatment Plant suffered from intrusion of hydrogen sulfide. It was left in a precarious state from a previous construction project by others before Bollig became the City Engineer. A replacement of that structure with a new Primary Clarifier was planned. During Phase 2, necessary infrastructure upgrades were completed and allowed for the City to be able to manage long-term. Construction began in 2018 with the following projects.

Key Projects:

  • Priority 2 Infrastructure Improvements
    • Additional water, sewer, and storm utilities replacement
    • Street reconstruction, mill and overlay
    • Installed backwash tank at drinking water treatment plant
  • Priority 2 Wastewater Treatment Plant Improvements
    • Replaced Imhoff Tank with primary clarifier
    • Rebuilt sludge storage tank
  • Community Center ADA Improvements
    • Renovated bathrooms for ADA standards
    • Installed new ADA entry doors

Phase 3 – In Progress

At the end of Phase 2, the City of Sacred Heart had addressed all their underground utility and street needs and brought the Wastewater Treatment Plant into compliance. I & I has been drastically reduced, and operations have been simplified. Since the original planning was conducted, other infrastructure had aged to a point of needing to be addressed, and new federal regulations prompted additional Infrastructure needs. The City’s water tower is in good shape, but its coatings are nearing the end of their useful life. At the same time as recoating, the City plans to bring the water tower into compliance with modern safety standards. The City currently utilizes centralized ion exchange softening, and will need to replace the softeners to bring the City into compliance with wastewater chloride standards. The City of Sacred Heart is working to obtain Legislative Bonding to leverage the Federal and City funding proposed to complete this project.

Upcoming Projects

The next construction efforts in Sacred Heart will focus on two major improvements: the Water Tower Rehabilitation and the addition of a Reverse Osmosis (RO) system at the Water Treatment Plant. The water tower project is currently out for bid, and the Reverse Osmosis project is expected to be bid soon.

Key Projects:

  • MnDOT Utility Adjustments: In conjunction with MnDOT’s reconstruction of Hwy 212 through Sacred Heart, the City needed to adjust the location of the water and sewer services throughout the corridor to enable construction of a new MnDOT storm sewer system.
  • Drinking Water: A new Reverse Osmosis softening system will be installed on the existing Water Treatment Plant (WTP) that will remove the existing ion exchange softening system and its wastewater chlorides.
  • Wastewater Storage: A second 90,000-gallon sludge tank will accommodate the City’s projected sludge generation with the addition of the Reverse Osmosis treatment system.
  • Water Storage: The water tower, originally moved and reassembled in Sacred Heart in 1965, will be rehabilitated to meet OSHA standards including installing coatings compliant with current drinking water standards.

Funding Success:

In 2011, the City of Sacred Heart began working with Bollig Engineering to secure funding for its citywide infrastructure improvements, starting with the first of three phases. In aggregate, the city’s utility improvement projects have totaled $19.2 million. Phases 1 and 2 were completed with 56% grant funding from USDA Rural Development, MN Public Facilities Authority Water (PFA) Infrastructure Funding, and MN DEED Small Cities Development Program Grant. Phase 3 of Sacred Heart’s infrastructure project is moving forward with an impressive funding structure. Approximately 80% of the total project cost is expected to be covered by grants from MN PFA Point Source Implementation Grant (PSIG), USDA Rural Development, and SCDP.

Learn more about the City of Sacred Heart on the city’s website or Facebook Page.

Location

Sacred Heart, MN

Population

510

Key Elements

  • Strategic planning – water, sanitary sewer, storm sewer, streets
  • Utility modeling
  • Design
  • Construction
  • User rate scenarios
  • Funding acquisition

Projects Costs and Funding

 

Phase 1-2

  • $19.2 million Project Costs
  • $10.7 million in grant funding
  • 56% funded by grants

 

Phase 3 (In Progress)

  • $10.6 million Projects Costs
  • $8.5 million in grant funding
  • 80% funded by grants

Project Time Frame

2011-Current
ScreenShot_20240123144112

Brooke Hebrink

City Council Member,
City of Sacred Heart

"As a member of the Sacred Heart City Council, I've worked with Bollig, Inc for the past 10 years on several infrastructure and utility improvement projects... Sacred Heart has placed a great deal of trust in Bollig, Inc and we recognize we would not be where we are today without their guidance and expertise. We are proud of the relationships we've built with the Bollig Team. They've become a part of our community, and they understand who we are - they truly are neighbors serving neighbors!”