Check out the latest updates about this project below.
Construction is expected to begin the week of July 6, with tree removal starting on Monday and asphalt pavement reclamation (grinding up the street pavement into gravel) planned to begin on Thursday. Please plan to have no vehicles parked on the street during these activities. The gravel surface produced by reclamation will be drivable.
Water and sewer underground construction is planned to begin on the 600 block (farthest south block) of Grove Street the week of July 13 and is expected to last two weeks. Vehicle traffic will not be possible during underground utility construction.
Residents are receiving mailed notices about the project. More details to come!
Lamberton’s Grove Street project consists of replacing one block of sanitary sewer, two blocks of watermain, and four blocks of street reconstruction, including curb & gutter, driveway aprons, and sump pump service lines. Most of this work will occur during the Summer of 2026, with final layer of pavement and turf restoration expected in Spring/Summer of 2027.
The map shows areas that will be directly affected by construction activities. During construction, expect to see heavy truck and equipment traffic, closed streets, and limited street parking at times. Turf restoration of disturbed areas, such as lawn grading and seeding, will also take place. Your efforts in helping water newly seeded areas will promote growth of a thicker, healthy lawn faster. Watermain replacement will require temporary watermains to provide water access to system users throughout construction as watermains are taken offline for replacement. During key connections, residents may experience brief water service interruptions and temporary changes in water quality as pipe is disturbed by construction.
Project funding is provided by USDA Rural Development Loans, with a portion of the project costs to be funded by special assessments. Total project cost is estimated to be approximately $1.28 million.
The City of Lamberton, Contractors, and Bollig Engineering ask that everyone stay clear of construction zones, obey construction signs, and be safe and cautious around construction equipment. If you have questions or concerns about the project, please contact any of the Bollig representatives.
haga clic aquí Para obtener consejos sobre la restauración del césped y cómo cuidarlo una vez finalizado el proyecto de construcción.
Chris Brouwer
Representante Residente del Proyecto
Ingeniería Bollig
cbrouwer@bollig-engineering.com
320-262-5936
Scott Kuhlman
Gerente de proyecto
Ingeniería Bollig
skulhman@bollig-engineering.com
320-222-3061
Contractor:
Bromeling Excavating, Inc
507-387-7926